PRICES WITH A TRACEABLE BASIS
Property prices 2025 in Vienna: official benchmarks
2025 price level · published May 2026 · Statistik Austria
Compare the same reference category across districts. Full size and construction-period tables are available on each district page.
- Building land: district average per m² of land
| District | Building land |
|---|---|
| Vienna 1 · Innere Stadt | — |
| Vienna 2 · Leopoldstadt | — |
| Vienna 3 · Landstraße | — |
| Vienna 4 · Wieden | — |
| Vienna 5 · Margareten | — |
| Vienna 6 · Mariahilf | — |
| Vienna 7 · Neubau | — |
| Vienna 8 · Josefstadt | — |
| Vienna 9 · Alsergrund | — |
| Vienna 10 · Favoriten | 730.7 |
| Vienna 11 · Simmering | 850.5 |
| Vienna 12 · Meidling | 856.1 |
| Vienna 13 · Hietzing | 1,163.6 |
| Vienna 14 · Penzing | 958.0 |
| Vienna 15 · Rudolfsheim-Fünfhaus | — |
| Vienna 16 · Ottakring | 1,036.0 |
| Vienna 17 · Hernals | 1,000.9 |
| Vienna 18 · Währing | 2,181.4 |
| Vienna 19 · Döbling | 1,756.0 |
| Vienna 20 · Brigittenau | — |
| Vienna 21 · Floridsdorf | 669.6 |
| Vienna 22 · Donaustadt | 801.6 |
| Vienna 23 · Liesing | 826.6 |
— = no value in the official table. Source notes identify pooled or substituted categories. House figures use plot-size bands that differ between districts.
Download the price data on this page: CSV · JSON-LD (GZIP)
Source: STATISTIK AUSTRIA. Selected and reformatted by ImmoWertAtlas; published numerical values are unchanged. Source usage terms
What these figures mean and how they are produced
The statistics use purchases by private households from 2021–2025. Earlier transactions are model-adjusted to the 2025 price level. The published figures are geometric means, providing regional category benchmarks. They are not current asking prices or individual property valuations.
- Apartments and houses: district level. An individual municipality, micro-location, specification or condition can differ substantially.
- Building land: municipal figures are also published. Where transactions are sparse, the source groups municipalities. A district figure is a regional overview, not a replacement for a municipal figure.
- The category and area definition must fit. House figures already account for land through the plot-size category. These tables do not cover whole rental buildings or commercial properties.
Published 28 May 2026 · Reference year 2025 · Sources checked 13 November 2026. Missing values remain unavailable; they are neither estimated nor replaced with zero.
The next step is to compare the property’s address, condition and rights with relevant recent sales. Request a personal assessment.
KNOWLEDGE FOR YOUR DECISION
Land valuation in Vienna: evidenced use and development potential
A land valuation in Vienna depends on the use actually supported for the individual parcel. Zoning, development rules, access, services and rights shape the assessment. An attractive development idea remains a possibility until its conditions have been established.
Vienna · Land
23 districts, different neighbourhoods and the exact address
Vienna’s districts contain very different areas. Official descriptions range from the historic centre to Donaustadt’s U2 neighbourhoods. Record district, neighbourhood and actual street- or courtyard-facing setting together; the postcode is only an orientation aid. For land, location must be identified down to the cadastral locality and parcel.
- Evidence to prepare
- Start with the parcel number and cadastral locality. Document setting, shape, public access and neighbouring buildings without treating them as evidence of your own development rights.
- What this changes for your decision
- This improves selection of suitable comparables and a clear location description. A shared municipality or postcode does not automatically mean the same residential or use situation.
Check road, rail and other noise sources by address
Official strategic noise maps display different noise sources separately. For a Vienna property, relate those layers to building side, floor and documented construction; a quiet district description or absent contour does not establish individual quietness. Possible future residential use cannot be equated with today’s impression of an undeveloped site.
- Evidence to prepare
- Check noise sources for the exact parcel and intended use. Record which assumptions about building layout and acoustic protection remain unresolved.
- What this changes for your decision
- The valuation effect requires actual exposure and suitable comparables. A noise map does not replace an individual measurement; a blanket premium or discount for the whole locality would not be justified.
Vienna planning document: distinguish map, text and binding position
The city provides mapped plans and written provisions through its information system and notes that the system is not legally binding. For extension or new-build assumptions, establish the relevant documents and currently applicable position. Permitted use and its prerequisites are checked for the plot itself.
- Evidence to prepare
- Save the plan, legend, written provisions and date checked. Review zoning, building form, heights, setbacks and any additional provisions for the specific parcel.
- What this changes for your decision
- Valuation and sale can rely on the possibilities actually substantiated. Neighbouring development or a long-term policy objective does not replace checking your own parcel.
FROM EVIDENCE TO ASSESSMENT
Land valuation: the questions behind the assessment
Local evidence and market data are set out above. These records help with the next property-specific checks; each link opens the complete explanation on the topic page.
Which permitted use supports land value in Vienna?
Keep the parcel number, cadastral municipality, applicable planning map and text, existing decisions and dated authority correspondence together.
Read the full check and its implicationsWhy neighbouring prices do not establish land value
Record the date and source of any available comparable evidence. Explain how each plot resembles yours and identify the material differences.
Read the full check and its implicationsRead area, boundaries and usable rights together
Provide a current register extract, relevant deeds, cadastral status and survey plans. For access and utility rights, identify the route, benefiting parcels and agreed extent of use.
Read the full check and its implicationsDescribe servicing as an evidenced condition
Organise connection statements, utility plans, agreements, invoices and municipal charge decisions separately for water, drainage, energy and access.
Read the full check and its implicationsGround conditions and hazards affect feasibility
Record available borehole logs, reports, past water or damage events and the source and scale of maps used. Commission targeted investigation where a specific site question remains unresolved.
Read the full check and its implicationsSeparate site history from development expectations
Collect the site’s use history, available investigation reports and a current map enquiry. Keep project drawings, approval status and cost estimates separate from the established position.
Read the full check and its implicationsWELL PREPARED
Documents for your land valuation in Vienna
- Land register and unambiguously identified plots
- Cadastral status and available surveys
- Legally effective zoning and planning records
- Evidence of access and existing rights
- Available connection and servicing information
- Site information and purpose of the assessment
Identify each detail as evidenced, estimated or unresolved. Relevant records are described alongside the questions above. This helps establish which missing information actually matters for your property.
The purpose forms part of the assessment. For inherited property, separation or financial changes a clear valuation date and shared information provide a useful starting point.
GEOGRAPHICAL CONTEXT
Vienna: area and location at a glance
The boundary helps identify the area. For your property, the actual address, use and local questions discussed in this article remain essential.
Area, coordinates & source data
Vienna · Orientation point: 48.20844° N, 16.37784° E (WGS84).
The point is derived from the official boundary and lies inside the displayed area. It is neither an official town centre nor a business location. The map shows administrative boundaries; it does not establish property boundaries, zoning or property values.
Boundary reference date: 2026-09-01 · Complete boundary geometry (GeoJSON)
Vienna districts
PRACTICAL ANSWERS FOR OWNERS
Questions about Land valuation in Vienna
Is a Vienna postcode enough to find suitable comparables for my plot?
The historic centre and Donaustadt’s U2 neighbourhoods represent different local settings. Narrow the search by neighbourhood and street section; a shared postcode does not replace comparison of the actual surroundings. Compare the actual parcel with land of similar permitted use, servicing and shape.
Does an absent contour on Vienna’s noise map prove that my plot is quiet?
Read the noise sources separately and match them to the actual address. The map provides a basis for questions; it does not establish on-site experience or a particular level of protection from the property. Include intended use and unresolved assumptions about a future building in the assessment.
Which planning records actually apply to my plot in Vienna?
Does “building area” in the land-register description mean I may build there?
Why do I need the written provisions as well as the zoning map?
A planning map can refer to special provisions explained only in the accompanying text. Vienna’s planning documents contain both a map and written provisions. Check both for the individual parcel and applicable version. A screenshot without the written provisions can omit material conditions.
How does access across someone else’s land affect value?
Is land safe if HORA shows no obvious hazard?
That is not a comprehensive assurance of safety. HORA is an initial guide, and maps differ in modelling, scale and coverage. For your Vienna address, also review site-specific investigations and available official maps. Past events and the proposed building project may call for further investigation.
Are poor ground conditions and contamination the same issue?
No. Bearing capacity, filled ground and groundwater primarily concern foundations and construction. Contamination is a separate question. A geotechnical report and an environmental investigation may therefore answer different questions. Check the scope of each report before treating it as an all-purpose clearance.
What does the absence of a contaminated-sites map entry mean?
It does not prove that the ground is uncontaminated. The portal publishes defined investigated or assessed sites, rather than every potentially affected area. Where there are specific indications, examine historical uses and available investigations. The current site enquiry replaced the former suspected-sites enquiry in 2025.
Does value automatically rise if two building plots seem possible?
A subdivision idea first needs legal and technical feasibility. Check the new boundaries, access, permitted development and procedural costs. In Vienna, subdivisions require approval or notification depending on the proposal, and land registration requires appropriate survey documents. Compare any possible additional proceeds with the extra work and expense.
Does an assessment commit me to selling or appointing an agent?
No. You decide which step to take. A valuation or consultation enquiry does not appoint an agent. Any engagement, its services and its terms are agreed separately.
How does an agent introduction through ImmoWertAtlas work?
An introduction is made at your explicit request. A suitable contact depends on the property type, location and your plans. The requested introduction and the information needed for it are discussed with you first. You then decide whether to work together.
Sources & supporting references22 sources
Legislation, official information and supporting references for the guidance on this page. How we assess sources and statements.
- Baugrundstückspreise 2025statistik.atBack to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Austrian government: the land registeroesterreich.gv.atBack to text
- Grundbuchsauszug vor dem Kauf eines Grundstücksoesterreich.gv.atBack to text
- Back to text
- Back to text
- Baugrund-Erkundungwien.gv.atBack to text
- Back to text
- Back to text
- Altlastenportal · Häufig gestellte Fragenaltlasten.gv.atBack to text
- Back to text
- Gestaltung des A1-Blattesoesterreich.gv.atBack to text
Knowledge