PRICES WITH A TRACEABLE BASIS
Property prices 2025 in Vienna Donaustadt: official benchmarks
2025 price level · published May 2026 · Statistik Austria
Apartment and house data area: Vienna 22 · Donaustadt.
Building-land prices 2025
This is a district average for regional orientation. For land in Lower Austria, also identify the correct municipality; the district figure must not be presented as its municipal figure.
Download the price data on this page: CSV · JSON-LD (GZIP)
Source: STATISTIK AUSTRIA. Selected and reformatted by ImmoWertAtlas; published numerical values are unchanged. Source usage terms
What these figures mean and how they are produced
The statistics use purchases by private households from 2021–2025. Earlier transactions are model-adjusted to the 2025 price level. The published figures are geometric means, providing regional category benchmarks. They are not current asking prices or individual property valuations.
- Apartments and houses: district level. An individual municipality, micro-location, specification or condition can differ substantially.
- Building land: municipal figures are also published. Where transactions are sparse, the source groups municipalities. A district figure is a regional overview, not a replacement for a municipal figure.
- The category and area definition must fit. House figures already account for land through the plot-size category. These tables do not cover whole rental buildings or commercial properties.
Published 28 May 2026 · Reference year 2025 · Sources checked 13 November 2026. Missing values remain unavailable; they are neither estimated nor replaced with zero.
The next step is to compare the property’s address, condition and rights with relevant recent sales. Request a personal assessment.
KNOWLEDGE FOR YOUR DECISION
Land valuation in 1220 Vienna – Donaustadt: evidenced use and development potential
A land valuation in Vienna Donaustadt depends on the use actually supported for the individual parcel. Zoning, development rules, access, services and rights shape the assessment. An attractive development idea remains a possibility until its conditions have been established.
Vienna Donaustadt · Land
Typical addressing postcode for orientation; some postal mappings cross district boundaries. Use each property’s actual address.
Along the U2: distinct neighbourhoods
The development area along the U2 extends from the north bank of the Danube to Seestadt Aspern. The city expressly identifies old village centres, new residential quarters, detached-house neighbourhoods and commercial areas within it. For land, location must be identified down to the cadastral locality and parcel.
- Evidence to prepare
- Start with the parcel number and cadastral locality. Document setting, shape, public access and neighbouring buildings without treating them as evidence of your own development rights.
- What this changes for your decision
- This improves selection of suitable comparables and a clear location description. A shared municipality or postcode does not automatically mean the same residential or use situation.
Strombucht: an identified Old Danube access point
Strombucht at Dampfschiffhaufen 10 in Donaustadt is a designated natural swimming spot on the Old Danube. The city lists a sunbathing lawn, seating and a gravel beach among its facilities. For land, distinguish landscape setting from the permitted use of the plot itself.
- Evidence to prepare
- Check parcel boundaries, current zoning and applicable protection boundaries. Nearby greenery does not prove that an area is buildable or available for private use.
- What this changes for your decision
- Documented private outdoor space can be distinguished from public recreational amenities. Neither a fixed premium nor an established extension right follows automatically.
Planning records for a proposal in Donaustadt
For a proposal in Donaustadt, review the relevant Vienna planning documents together with their mapped and written provisions. The city’s online information is a research aid, not a binding confirmation of a particular development possibility. Permitted use and its prerequisites are checked for the plot itself.
- Evidence to prepare
- Save the plan, legend, written provisions and date checked. Review zoning, building form, heights, setbacks and any additional provisions for the specific parcel.
- What this changes for your decision
- Valuation and sale can rely on the possibilities actually substantiated. Neighbouring development or a long-term policy objective does not replace checking your own parcel.
FROM EVIDENCE TO ASSESSMENT
Land valuation: the questions behind the assessment
Local evidence and market data are set out above. These records help with the next property-specific checks; each link opens the complete explanation on the topic page.
Which permitted use supports land value in Vienna Donaustadt?
Keep the parcel number, cadastral municipality, applicable planning map and text, existing decisions and dated authority correspondence together.
Read the full check and its implicationsWhy neighbouring prices do not establish land value
Record the date and source of any available comparable evidence. Explain how each plot resembles yours and identify the material differences.
Read the full check and its implicationsRead area, boundaries and usable rights together
Provide a current register extract, relevant deeds, cadastral status and survey plans. For access and utility rights, identify the route, benefiting parcels and agreed extent of use.
Read the full check and its implicationsDescribe servicing as an evidenced condition
Organise connection statements, utility plans, agreements, invoices and municipal charge decisions separately for water, drainage, energy and access.
Read the full check and its implicationsGround conditions and hazards affect feasibility
Record available borehole logs, reports, past water or damage events and the source and scale of maps used. Commission targeted investigation where a specific site question remains unresolved.
Read the full check and its implicationsSeparate site history from development expectations
Collect the site’s use history, available investigation reports and a current map enquiry. Keep project drawings, approval status and cost estimates separate from the established position.
Read the full check and its implicationsWELL PREPARED
Documents for your land valuation in Vienna Donaustadt
- Land register and unambiguously identified plots
- Cadastral status and available surveys
- Legally effective zoning and planning records
- Evidence of access and existing rights
- Available connection and servicing information
- Site information and purpose of the assessment
Identify each detail as evidenced, estimated or unresolved. Relevant records are described alongside the questions above. This helps establish which missing information actually matters for your property.
For the wider region, see Land valuation in Vienna.
The purpose forms part of the assessment. For inherited property, separation or financial changes a clear valuation date and shared information provide a useful starting point.
GEOGRAPHICAL CONTEXT
Vienna Donaustadt: area and location at a glance
The boundary helps identify the area. For your property, the actual address, use and local questions discussed in this article remain essential.

Area, coordinates & source data
Vienna Donaustadt · Orientation point: 48.21889° N, 16.49491° E (WGS84).
The point is derived from the official boundary and lies inside the displayed area. It is neither an official town centre nor a business location. The map shows administrative boundaries; it does not establish property boundaries, zoning or property values.
Boundary reference date: 2026-09-01 · Complete boundary geometry (GeoJSON)
PRACTICAL ANSWERS FOR OWNERS
Questions about Land valuation in Vienna Donaustadt
Is proximity to the U2 enough to value my plot in Donaustadt?
Identify the specific station and route from the actual property access point. Also compare the neighbourhood’s present development stage; the same underground line serves locations with different uses and open spaces. Compare the actual parcel with land of similar permitted use, servicing and shape.
Does proximity to Strombucht count like a private waterfront right for my plot?
The documented swimming spot is initially a public recreational facility. Private shore, jetty or other use rights require evidence in the property records and cannot be inferred merely from proximity. A development scenario needs substantiated use possibilities for the parcel, not an attractive setting alone.
Can every Donaustadt allotment house be occupied year-round?
Does “building area” in the land-register description mean I may build there?
Why do I need the written provisions as well as the zoning map?
A planning map can refer to special provisions explained only in the accompanying text. Vienna’s planning documents contain both a map and written provisions. Check both for the individual parcel and applicable version. A screenshot without the written provisions can omit material conditions.
How does access across someone else’s land affect value?
Is land safe if HORA shows no obvious hazard?
That is not a comprehensive assurance of safety. HORA is an initial guide, and maps differ in modelling, scale and coverage. For your Vienna address, also review site-specific investigations and available official maps. Past events and the proposed building project may call for further investigation.
Are poor ground conditions and contamination the same issue?
No. Bearing capacity, filled ground and groundwater primarily concern foundations and construction. Contamination is a separate question. A geotechnical report and an environmental investigation may therefore answer different questions. Check the scope of each report before treating it as an all-purpose clearance.
What does the absence of a contaminated-sites map entry mean?
It does not prove that the ground is uncontaminated. The portal publishes defined investigated or assessed sites, rather than every potentially affected area. Where there are specific indications, examine historical uses and available investigations. The current site enquiry replaced the former suspected-sites enquiry in 2025.
Does value automatically rise if two building plots seem possible?
A subdivision idea first needs legal and technical feasibility. Check the new boundaries, access, permitted development and procedural costs. In Vienna, subdivisions require approval or notification depending on the proposal, and land registration requires appropriate survey documents. Compare any possible additional proceeds with the extra work and expense.
Does an assessment commit me to selling or appointing an agent?
No. You decide which step to take. A valuation or consultation enquiry does not appoint an agent. Any engagement, its services and its terms are agreed separately.
How does an agent introduction through ImmoWertAtlas work?
An introduction is made at your explicit request. A suitable contact depends on the property type, location and your plans. The requested introduction and the information needed for it are discussed with you first. You then decide whether to work together.
Sources & supporting references21 sources
Legislation, official information and supporting references for the guidance on this page. How we assess sources and statements.
- Baugrundstückspreise 2025statistik.atBack to text
- Back to text
- Back to text
- Back to text
- Back to text
- Stadt Wien · Kleingartenwohnhäuserwien.gv.atBack to text
- Back to text
- Back to text
- Back to text
- Back to text
- Back to text
- Austrian government: the land registeroesterreich.gv.atBack to text
- Grundbuchsauszug vor dem Kauf eines Grundstücksoesterreich.gv.atBack to text
- Back to text
- Back to text
- Baugrund-Erkundungwien.gv.atBack to text
- Back to text
- Back to text
- Altlastenportal · Häufig gestellte Fragenaltlasten.gv.atBack to text
- Back to text
- Gestaltung des A1-Blattesoesterreich.gv.atBack to text
Knowledge